HSE – No LTI’s, reportable injuries or incidents.
Scope of Work
- Removal & Replacement of Tub for New (Hofmann)
- Upper Rails Replacement (Hofmann)
- Hoist Drum Replacement
- Swing Machinery Overhaul
- Drag Gearcase 1 & 2 Overhauls
- Centre Bearing & Bush Replacement
- Upper Drag Sheaves & Fairleads Overhaul
- Hoist Deflection Sheaves Overhaul
- Rev Frame, House and Boom Crack Repairs